Stormwater Pollution Prevention Plans:
   - Site assessments
   - BMP selection
   - Implementation
   - Evaluation





Stormwater Design:
   - Site Planning
   - LID BMP selection


Erosion and Sediment Control:
   - E&S Planning
   - E&S Plan
      Development
   - E&S Plan Review
   - E&S BMP
      Inspection



 


Stormwater Planning

ATR Associates assists government and commercial clients with stormwater permitting and compliance, assists planners and designers with stormwater planning, and assists engineers and contractors with erosion and sediment control. Our stormwater planning activities focus on smaller-scale projects, for larger projects click on the "Watersheds" link below.


Stormwater Pollution Prevention Plans

ATR Associates has prepared stormwater pollution prevention plans for municipal and commercial clients.  We:
   • Assist management with the preparation of administrative elements of the plan
   • Perform site assessments and evaluations
   • Select appropriate BMPs
   • Assist in the implementation of the plan through training and construction of
      some BMPs
   • Evaluate the effectiveness of the plan through auditing and stormwater
      monitoring




Stormwater Design

ATR Associates engineers work with planners and developers to design effective, low-impact stormwater management systems.  For more information about our capabilities with respect to stormwater design, click on the link below to "Low-Impact Development".




Erosion and Sediment Control

ATR Associates engineers can help developers minimize erosion and sediment production at sites through proper planning, including minimizing disturbed aras and managing stormwater and sediments on-site. We can also prepare and review erosion and sediment control plans and inspect erosion and sediment control BMPs.  Our E&S Plans include all appropriate elements depending on the particular local requirements, but at a minimum they include:
   •  A location map
   •  A Site Plan showing existing conditions
   •  A Grading Plan showing proposed conditions
   •  A Erosion & Sediment Control Plan showing E&S BMPs
   •  Construction sequence and timeline, including E&S activities associated with
       each phase of construction
   •  A Narrative description of the E&S activities



Contact us about Stormwater Planning


Go to Watersheds

Go to Low-Impact Development

Back to Stormwater Management