LID Site Planning Concepts:

  - Use hydrology as
    the integrating
    framework

  -  Control storm
     water at its
     source

  - Use simple, non-
     structural methods
     to the extent
     feasible

  - Create a multi-
     functional
     landscape


LID Hydrology Concepts:

  - LID Design Storm

  - Drainage envelope
     Tc

  - Recharge volume






BMPs and IMPs:

  - Bioretention

  - Dry wells

  - Grassed swales

  - Infiltration
     trenches

  - Porous pavement

  - Porous pavers




Low Impact Development

ATR Associates can help with all aspects of Low Impact Development (or "LID") projects - from initial planning through design and construction.

LID Site Planning

ATR Associates assists planners and developers in developing LID site plans. We follow the 9-step process outlined by Prince George's County, Maryland. The steps are:
   • Identify applicable zoning, land use, subdivision and other local regulations
   • Define the drainage envelope
   • Use drainage/hydrology as a design element
   • Reduce/minimize total site impervious areas
   • Integrate preliminary site layout plan
   • Minimize directly-connected impervious areas
   • Modify/increase drainage flow paths
   • Compare pre- and post-development hydrology
   • Complete the LID Site Plan


Hydrologic Analysis

ATR Associates performs comprehensive LID hydrologic analyses to serve as the basis for BMP/IMP design. These analyses include:
   • Development of the LID Design Storm
   • Determine times of concentration for drainage envelopes
   • Determine the runoff and infiltration volumes to be maintained


BMP/IMP Design

ATR Associates prepares detailed engineering designs of Best Management Practices (BMPs) and Integrated Management Practices (IMPs).
   • Grading plans
   • Input and Output hydrograph analyses
   • Nutrient reduction analyses
   • Piping specifications
   • Pond design for hybrid management


Contact us about LID


Go to Rain Gardens

Go to Watersheds


Back to Stormwater Management